Resource Process - Mix concrete 1

Characteristics

AttributeValue
Process Time:200 millisols
Work Time:10 millisols
Power Required:0.2 kW/hr
Start On:false

Inputs

NameInput Rate (kg/sol)Minimum kgAmbient
Cement34.00.002false
Sand60.00.003false
Water5.00.0false
Polyethylene1.00.0false

Ambient inputs are consumed from the environment.

Outputs

NameOutput Rate (kg/sol)Waste Output
Concrete100.0false

Waste outputs are released into the environment and do not need to be stored.

Version: 3.9.0 Generated on: 2025-03-08T21:34:45.1684317