Resource Process - Do Malachite smelting

Characteristics

AttributeValue
Process Time:200 millisols
Work Time:10 millisols
Power Required:1.3 kW/hr
Start On:false

Inputs

NameInput Rate (kg/sol)Minimum kgAmbient
Carbon2.70.0false
Malachite50.00.003false

Ambient inputs are consumed from the environment.

Outputs

NameOutput Rate (kg/sol)Waste Output
Copper28.7false
Carbon dioxide19.9false
Brine Water4.1false

Waste outputs are released into the environment and do not need to be stored.

Version: 3.9.0 Generated on: 2025-03-08T21:34:45.1684317