Manufacturing Process - Do steel ingot nickel alloying

Description

For steel produced from recycled scrap using an electric arc furnace (EAF), the energy onsumption is approximately 2.25 × 10⁹ J per metric ton (1,000 kg) of steel. This equates to 2.25 × 10⁶ J per kilogram. Therefore, for 25 kg of steel, the energy required would be: 25 kg * 2.25e6 J/kg = 56.25e6 = 56.25 MJ This is trueif made from recycled scrap via an electric arc furnace, or about 612.5 MJ if produced from virgin iron ore using a basic oxygen furnace.

Characteristics

AttributeValue
Type:Manufacture
Skill Level:1
Tech Level:1
Process Time:50.0 millisols
Tooling:Furnace
Work Level:10.0 millisols
Power Required:1.0 kW/hr

Inputs

InputAmount
CarbonResource
iron powderResource
nickelResource

Products

ProduceAmount
steel ingot5